[proxy] en.wikipedia.org← back | site home | direct (HTTPS) ↗ | proxy home | ◑ dark◐ light

Tung Chung line

Contributors to Wikimedia projects

From Wikipedia, the free encyclopedia

Tung Chung line
東涌綫

A Tung Chung line CAF–train approaching Sunny Bay station, bound for Hong Kong

Overview
StatusOperational
OwnerMTR Corporation
LocaleDistricts: Islands, Tsuen Wan, Kwai Tsing, Sham Shui Po, Yau Tsim Mong, Central & Western
Termini
Connecting lines
Former connectionsWest Rail line
Stations8
Color on map     Orange (#F7943E)
Service
TypeRapid transit
SystemMTR
Operator(s)MTR Corporation
Depot(s)Siu Ho Wan
Rolling stock
Ridership236,900 daily average
(weekdays, September 2014)[1]
History
CommencedNovember 1994; 31 years ago
Opened22 June 1998; 27 years ago
Technical
Line length31.1 km (19.3 mi)
Number of tracks
Track gauge1,432 mm (4 ft 8+38 in)
Electrification1.5 kV DC (Overhead line)
Operating speed
  • Maximum: 135 km/h (84 mph)[2]
SignallingAdvanced SelTrac CBTC (future)[3]
Train protection systemSACEM (to be replaced)

Route map


Tamar     

Hong Kong     

Kowloon     

Olympic

Nam Cheong     

Lai King     

Tsing Yi     

Sunny Bay     

Siu Ho Wan depot

Oyster Bay[4]

Tung Chung East

Tung Chung

Tung Chung West

This diagram:

Tung Chung line
Traditional Chinese東涌綫
Simplified Chinese东涌线
Literal meaningEast (of a) branch of a river line
Transcriptions
Standard Mandarin
Hanyu PinyinDōngchōng xiàn
Yue: Cantonese
Yale Romanizationdūng chūng sin
Jyutpingdung1 cung1 sin3

The Tung Chung line (Chinese: 東涌綫) is one of the ten lines of the MTR system in Hong Kong, linking the town of Tung Chung with central Hong Kong. It was built in the 1990s as part of a railway project to support the new Chek Lap Kok Airport. The line currently travels through eight stations in 31 minutes along its route.

In October 1989, the Hong Kong government announced plans to build a new airport on the island of Chek Lap Kok to replace the overcrowded Kai Tak International Airport in the heart of Kowloon.[5]

As part of the initiative, the government invited the MTR Corporation to build a rail link to the new airport. The project initially saw opposition from the Chinese government as it feared the construction would drain the fiscal reserves of the Hong Kong government and leave the Chinese with nothing after the British handed the territory over in 1997.

Both the Chinese and British governments reached an agreement and construction commenced in November 1994. The line was originally named Lantau line but was later renamed Tung Chung line during the construction.

The Lantau Airport rail link consists of two train lines, the Tung Chung line and the Airport Express. Both lines deploy the same rolling stock but with differences around interior fittings and liveries. The Lantau Airport Railway had consultants such as Arup, Halcrow, Meinhardt, Hyder Consulting, and others, at the time of the construction.[6]

On 22 June 1998, the Tung Chung line was officially opened by Chief Executive Tung Chee-hwa, and service commenced the next day.[7]

On 16 December 2003, an open house for charity took place at the recently completed Nam Cheong station, an interchange between the Tung Chung line and soon to be opened West Rail line. The station then closed on 19 December 2003 in preparation for the opening of the new KCR West Rail, and it was officially opened to public on 20 December 2003. Since then, the number of cars per train has increased from seven to eight to accommodate the additional patronage.

Sunny Bay station opened on 1 June 2005 as an interchange for the Disneyland Resort line. The resort opened its doors two months after the station became operational.

Between 2006 and 2007, four brand new Korean Rotem Emu entered service to increase service frequency. The first train was delivered on 9 February 2006 and entered service on 12 June 2006. Modifications were added to the platforms to accommodate the new trains, which are a few millimetres wider than the original rolling stock.

MTR Tung Chung line Rolling stock
Model Manufacturer Time of manufacturing Sets Formation
CAF-Train Adtranz and CAF 1996–1997 12 V-W-X-Y-W-X-Z-V
K-Train Hyundai Rotem and Mitsubishi Heavy Industries 2004–2005 4 V-Z-X-Y-W-X-Z-V

Unlike most other railway lines in the system, the Tung Chung line travels mostly above ground and spans a greater distance. The line shares its trackage with the Airport Express between Kowloon and Hong Kong, Tsing Yi and Tung Chung East and before diverging right before Tung Chung station.

The line travels underground from Hong Kong station to Kowloon station across the harbour, then surfaces to the ground to reach Olympic station. Trains continue to travel above ground along the West Kowloon Expressway and stops at Nam Cheong station, followed by Lai King station on a viaduct. Thereafter the line crosses the Rambler Channel and stops at Tsing Yi station on Tsing Yi Island.

Trains then enter a tunnel through the hills of the island and continues on the Tsing Ma Bridge and the Kap Shui Mun Bridge onto Lantau Island. The line continues along the North Lantau Expressway and stops at Sunny Bay before terminating at Tung Chung. The distance between the two stops is roughly 10 km (6.2 mi) and takes approximately 6 minutes to complete.

Some outbound peak trains do not continue to Lantau but terminate at Tsing Yi station instead due to less passengers continuing towards Tung Chung and the capacity constraint of the Tsing Ma Bridge which only allows one train per track every two and a half minutes.[8]

This is a list of the stations on the Tung Chung line.

List

Livery Station Name Images Interchange;
Adjacent transportation
Opening District
English Chinese
Tung Chung Line (TCL)
Hong Kong 香港 Airport Express

Central:
Tsuen Wan line
Island line

22 June 1998;
27 years ago
Central and Western
Kowloon 九龍 Airport Express

Austin:
Tuen Ma line

West Kowloon:
High-speed rail services to Mainland China

Yau Tsim Mong
Olympic 奧運
Nam Cheong 南昌 Tuen Ma line 20 December 2003;
22 years ago
Sham Shui Po
Lai King 茘景 Tsuen Wan line 22 June 1998;
27 years ago
Kwai Tsing
Tsing Yi 青衣 Airport Express
Sunny Bay 欣澳 Disneyland Resort line 1 June 2005;
20 years ago
Tsuen Wan
Oyster Bay 小蠔灣 2030;
4 years' time
Islands
Tung Chung East 東涌東 2029;
3 years' time
Tung Chung 東涌 Ngong Ping Cable Car 22 June 1998;
27 years ago
Tung Chung West 東涌西 2029;
3 years' time

Stations in Italic means that it is under construction

When British Hong Kong was planning to build the Airport Railway (Tung Chung line and Airport Express) in the 1990s, which was a few years before the handover to China, the Chinese government raised concerns about the effect of the project on the territory's fiscal reserves, which eventually forced the Hong Kong government to reduce the cost of the Airport Railway. The resulting changes made to the design imposed limitations on the level of service on the line.[9]

Extension in Tung Chung

[edit]

Tung Chung line extension

[edit]

In the Railway Development Strategy 2014, it was proposed that the Tung Chung Line be extended west and a new station constructed at Tung Chung West.[10]

In April 2020, Carrie Lam and the Executive Council approved the detailed planning and design of the Tung Chung line extension project consisting of two new stations. Construction began in May 2023, with the cost of the two new stations expected to be HK$24.2 billion in 2023. Tung Chung East is an infill station between Tung Chung and Sunny Bay, while Tung Chung West would be a new underground station west of Tung Chung and serve as the new terminus of the Tung Chung Line.[11] This extension is expected to be complete by 2029. The project is will extend the line by an additional 1.3 kilometres. The design contract for the extension was awarded to British engineering companies Arup and Atkins in June 2021.[12][13]

Extensions on Hong Kong Island

[edit]

Airport Railway Extended Overrun Tunnel (AREOT)

[edit]

An underground tunnel, around half a kilometer long, will be built eastwards of Hong Kong station. It will allow Tung Chung line and Airport Express trains to turn around so trains can easily switch directions and enhance operational efficiency. This project would also include the construction of a new ventilation building, ARB. Construction is expected to begin in 2025 and to be completed by 2032.[14][15]

Once the North Island line is complete, trains will travel in a tunnel east of Hong Kong station along the shore of the island before reaching Tamar, also connecting with the Tseung Kwan O line as an interchange. Three new stations – Tamar, Exhibition Centre and Causeway Bay North will form part of the extension. As of 2025, the government has stated that the extension isn't of high demand, and will not be completed before 2046.[16]

  1. ^ "Weekday patronage of MTR heavy rail network from September 1 to 27 and September 28 to October 25, 2014" (PDF). Legislative Council of Hong Kong. 29 October 2014. Retrieved 15 April 2015.
  2. ^ "Business Overview" (PDF). MTR. July 2021. p. 6. Retrieved 12 September 2022.
  3. ^ "Alstom and Thales to supply advanced CBTC signalling system to Hong Kong's seven metro lines". RailwayPRO. 26 January 2015. Retrieved 17 August 2022.
  4. ^ https://www.mtr.com.hk/en/corporate/tenders/SHD_1701.html
  5. ^ Basler, Barbara (16 October 1989). "INTERNATIONAL REPORT; Hong Kong Builds for the Future: Big Airport Project Is Under Way". The New York Times. ISSN 0362-4331. Retrieved 10 June 2024.
  6. ^ MTR Corporation Annual Report 1998. MTR Corporation. 1998.
  7. ^ MTR Corporation Annual Report 1998. MTR Corporation. 1999. p. 16.
  8. ^ "Legislative Council Panel on Transport, Subcommittee on Matters Relating to Railways, Airport Railway Capacity" (PDF). Legislative Council of Hong Kong. 17 November 2009. Retrieved 21 July 2017.
  9. ^ (in Chinese)MTR Service Update (26 November 2012). "為甚麼東涌綫總是班次疏落?". Retrieved 28 November 2012.
  10. ^ "Railway Development Strategy 2014" (PDF). Transport and Housing Bureau. 17 September 2014. Archived (PDF) from the original on 11 September 2022. Retrieved 27 March 2022.
  11. ^ 2023 Interim Results (PDF) (Report). MTR Corporation. 10 August 2023. p. 12. Retrieved 23 August 2023.
  12. ^ "Atkins-Arup JV to design Tung Chung Line Extension in Hong Kong – News – GCR". www.globalconstructionreview.com. Retrieved 30 June 2021.
  13. ^ "MTR receives approval for Tung Chung Line Extension project work". www.railway-technology.com. Retrieved 30 June 2021.
  14. ^ "Annual Report 2022: Connecting the Future" (PDF). MTR Corporation. 9 March 2023. p. 23.
  15. ^ "Harbourfront Commission Task Force on Harbourfront Developments on Hong Kong Island: Briefing on Development of Airport Railway Extended Overrun Tunnel (ARO)" (PDF). MTR Corporation. 25 April 2023. p. 6. Retrieved 23 August 2023.
  16. ^ 黃偉倫 (12 December 2023). "運輸藍圖|北港島線無期 南港島西棄重鐵 林世雄:不存在走數". 香港01 (in Chinese (Hong Kong)). Retrieved 21 September 2025.